Contents
Moments
- First and second moments - 12/23/2016
- First, second and third moments with FFT - with harps and scattering in fibers - 3/26/2017
- First, second and third moments with FFT - with harps but no scattering - 3/30/2017
- First, second and third moments with FFT - with harps and scattering in fibers, kicker error - 4/14/2017
- First, second and third moments with FFT - with harps and scattering in fibers, radial_field - 4/17/2017
- Quad voltage scan - Br=0 - No radial field - 6/17/2017
- Quad voltage scan- Br=50ppm - Radial field uniform at 50ppm - 6/17/2017
- First, second and third moments with FFT Quads at 15kV, with harps and no scattering in fibers, radial_field=0, full kick - 6/17/2017
- First, second and third moments with FFT - with harps and scattering in fibers, radial_field=0, 78% kick - 6/17/2017
- Distribution at Inflector Exit June 25, 2017
Simulation of commissioning run configurations defined here
- Configuration 6 Commissioning run simulation, 12-19kV scrape - 700 turns
- Configuration 6 Commissioning run simulation, 12-19kV scrape - 4000 turns
- Configuration 1 Commissioning run simulation, no scraping, timed on muons (60ns early)
- Configuration 2 Commissioning run simulation, no scraping, times on protons
- Configuration 6 +1% energy offset Variation on Commissioning run simulation
- Configuration 6 - no scraping Variation on Commissioning run simulation
- Configuration 3 Commissioning run simulation, Quads 14kV, no scraping
- Configuration 4 Commissioning run simulation, Quads 10-17kV, with scraping
- Configuration 6- nominal kickers Commissioning run simulation, Same as configuration6 but with nominal kicker voltages (55kV)
- Configuration 6- nominal twiss match Commissioning run simulation, Same as configuration6 but with nominal twiss match
- Configuration 7 Same as 6 except: track protons, but kicker timed 60ns early for muons.
- Configuration 8 Same as 6 except: track muons, with timed for muons.
- Configuration 6- 0.75 X nominal kickers Commissioning run simulation, Same as configuration6 but with nominal kicker voltages (41.25kV)
- Configuration 6- 0.5 X nominal kickers Commissioning run simulation, Same as configuration6 but with nominal kicker voltages (27.5kV)
- Configuration 6- 0.25 X nominal kickers Commissioning run simulation, Same as configuration6 but with nominal kicker voltages (13.75kV)
- Configuration 6 Commissioning run simulation, 12-19kV scrape - 2000 turns - November 2017 kicker calibration with magnetometer and measured pulse shape