Configuration 6 75%-nk - with harps - commissioning run.

  • Fiber harp data with lattice and input configured as per commissioning run. But with 0.75 X nominal kicker voltage of 41.25kV
  • Basic parameters of simulation - Configuration "6" with 0.75 X nominal kick
  • Lattice and initialization details are here

  • Output