Resonant Extractkion

AN EXTERNAL BEAM FROM THE CORNELL 10GEV SYNCHROTRON
1971 PAC pdf
J. DeWire, H. Edwards, R.Littauer, G.Rouse, R. Sundelin

Injection and extraction magnets: kicker magnets
2006 pdf
M.J.Barnes, et.al. (CERN)

MEASUREMENT OF TEVATRON EXTRACTION PARAMETERS AND COMPARISON OF MODEL TO MEASUREMENTS
1998 pdf
M.A. Martens, J. Marriner, J. Holt

Half-Integer Fast Resonant Extraction with Quasi Rectangular Spill
1992 pdf
Marcel Gyr and Eugene B. Vossenberg

HALF INTEGRAL RESONANT EXTRACTION FROM THE MAIN RING
June 6, 1972 pdf
L. c.Teng

Progress with kicker studies at KEK-ATF
March 5, 2007 pdf
T. Naito (KEK)

Ultra Fast Kicker Tests at KEK
10/7/2013 (LER2013) pdf
T. Naito (KEK)

HALF-INTEGER RESONANCE EXTRACTION FOR THE NAL ACCELERATOR
1973 pdf
H. T. Edwards, W. W. Lee, S. Ohnuma, J. D. McCarthy, and L. C. Teng

Beam Extraction by using Strip-Line Kicker at KEK-ATF
8 May 31, 2006 pdf
T. Naito (KEK)

SLOW EXTRACTION METHOD FOR THE COOLER INJECTOR SYNCHROTRON
1997 pdf
X. Kang, K. Fung, S. Y. Lee, and G. P. Berg

DEVELOPMENT OF STRIP-LINE KICKER SYSTEM FOR ILC DAMPING RING
2007 pdf
T. Naito#, J. Urakawa, K. Kubo, M. Kuriki, N. Terunuma, H. Hayano, KEK, Tsukuba, Japan

0927005.pdf 1103.1583.pdf 2B007.pdf EPAC1992_1501.pdf fermilab-tm-0375.pdf KickerNaito.pdf LER13-Naito.pdf list.dat PAC1973_0424.pdf proposal20060530.pdf resonantextraction.html resonantextraction.html~ THP12C.pdf THPMN028.PDF