Bunch-by-Bunch Analysis of Dynamic Aperture in CESRc Optics


Lattice: hibetainj_20040628_v01_flm_b10on_2

7 February 2005


9x4 positron bunches, uniformly filled. Design pretzel. Tunes now set to betasing-10-off design tunes of 0.518/0.577 and held constant independent of positron bunch current. This is the intended operational implementation. Sync tune 41 kHz.

This is the second-generation betasing 10, which compensates the BBI for bunch 3 rather than bunch 1 as did the first-generation knob. This knob was studied during the machine studies of 17 Jan 05.

These are the baseline conditions of this lattice, with betasing 10 set to 1000 cu. The beam-beam interaction at the IP has been turned off. These results show the effect of betasing 10 when subtracting the results of job 599 as the baseline. The design criterion was to restore the value of the horizontal beta* for train 1 bunch 3 at a positron current of 2 mA/bunch in the 9x4 configuration.
Log file



Creation date: 02/08/05.